Chigger Hill Spring 2000
The retaining wall was finished on Jan 15, 2000.
The electric and well are in; and I just
had to do a little outside decorating, even if it is
just artificial flowers.
The real ones will come when the grading is all done. You can just see
the red outside hydrant handle at the
top of the hill and the old
A-frame cabin in the background behind the corner of the garage/cabin roof.
The clearing outside the cabin door.
Inside the cabin.
Gene and Bandit
More inside the cabin
Windows into the garage. Better than no windows at all.
This hanging is going on the wall in the study.
May 24, 2000. Wonder of wonders, a water heater right next to the pressure tank....
.......... a bathroom with a shower ........
......... and the plumbing for a kitchen sink.
My favorite part of the creek. There has been so little rain the last two years it's almost dry. Just
a little water from the spring barely keeping it running. But at least
the spring is still running.
When the clearing is done I'm going to build a gazebo here with a
swing in it.
Looking over the creek and into the valley.
Looking down the creek. Barely enough water; but the minnows are still doing fine.
Farther down what used to be the deepest hole......
.... has turned into a puddle that disappears underground.
I'm not sure what these flowers are; but there's a lot of them down here.